My original clip was 66 frames long. Did a few complex tracks on it and now the client needs the take to be 5 frames longer.
So I go to Clip / Footage Streams and click Relink… and select the longer shot.
After two tries the system finally relinks to the 71 frame clip BUT when I switch to the Track tab I can still see only 66 frames of material.
Must be something silly simple but I’m really stuck.
Any ideas?
TIA,
K.